icon
Share price
23.06 EUR
Negative -0.12 (-0.52%)
Dive deeper
Back to top
icon
Juegos Panamericanos Santiago 2023
Santiago de Chile, Chile
icon Contact us
icon Close form

    Do you have any questions? Fill out the form and contact one of our experts

    Our team specializes in providing advisory and support services for the development of aquatic projects in different sectors

    All fields marked with a * are mandatory. We require this information to ensure the best experience during the service

    First of all, we need some general information about you and how we can reach you


    Remember this last field is not mandatory

    We are halfway there

    Please, tell us about your job

    Select your job profile *

    Select your job title

    Country *

    Select the typical scope of projects you collaborate on *

    We are almost done

    We would like to listen you. What are you interested in and what do you need?

    Select your sector interest

    Select your service interest *

    Do you need something specific? *

    Choose the service option according to your needs*

    To complete the submission of the form

    We need you to consent our policy



    Continue
    icon
    Fluidra refurbished and extended the aquatic sports center for the 2023 Pan American Games in Santiago de Chile.
    Fluidra carried out a project to refurbish and extend the Aquatic Center in Chile’s National Stadium to host the 2023 Pan American and Parapan American Games, that was held between 20 October and 5 November, and between 17 and 26 November, respectively, in Santiago de Chile.
    Description of Fluidra's scope
    The project consisted in the renovation of the competition pool (50 x 25 x 3 meters) and the training pool (50 x 25 x 2 meters), as well as the refurbishment and extension of the diving pool (20 x 25 x 5 meters). All of the work was carried out in line with the requisites set in the regulation on facilities by World Aquatics, formerly the International Swimming Federation (FINA).In the case of the competition and training pools, Fluidra’s proposal included the renovation of the pools’ coping using Skypool renovation panels in galvanized steel, the replacement of the current hydraulic system units and new swimming competition accessories.For the diving pool, the project included the renovation of the pool’s coping using Skypool galvanized steel panels 1.2 meters in height, plus the walkway, the sparger and agitation systems. In addition, we replaced and extended the current hydraulic system units with filters, filtration pumps, valves and a disinfection system.
    icon
    icon